HYB: Humpback Covered Bridge

Film clip

The next two entries are film clips from History in Your Backyard, a film series produced by Satolli Glassmeyer and Co.  Our first one looks at the Humpback Covered Bridge in Covington, Virginia. This bridge was built in 1856 and is the oldest covered bridge in Virginia, let alone one of the oldest in the country.  The bridge was one of the first to have been rehabilitated and repurposed for pedestrians, as this was done in 1957, almost 30 years since it was replaced by a truss bridge on a new alignment and later abandoned. And lastly, it was one of the first that was nominated to the National Register, as it was listed in 1969.  Take a look at the video about the bridge’s history, which includes photos and some other facts. The engineering details can be found here.

BHC 10 years

Paper Mill/Marshall Bridge: Rising from the Ashes- An Interview with Julie Bowers

 

bhc interview new

What is considered the impossible became the impossible. David never gave up on the notion of beating Goliath until it actually happened. Some heavily favorites can fall to the underdogs. All it takes is patience, preserverence, passion and persistence- the four Ps to success. Five if you want to include politics.

For Julie Bowers and the crew at Workin Bridges, those five Ps were needed plus some personnel with expertise and just as much of the five Ps to bring a bowstring arch bridge back from the rubble, resurrect the structure, restore it to its former glory and now, it’s being reused for recreation. That is the story behind the history of the Marshall Bostring Arch Bridge located now at the Auburn Heights Preserve in Delaware. It has gone by many names, but two come out as the most commonly used aside from its official name: the McIntyre Bowstring Arch Bridge when it was in Iowa, and most recently, Paper Mills Bridge. The bridge has come a long way after it was destroyed by flooding in August 2009 at its original location in Poweshiek County, spanning the Skunk River. After it was pulled from the river and stored, efforts were undertaken to restore it, which included a long journey to its new home in Yorklyn, Delaware. The Odyssey came with a lot of challenges, as you will see in the interview I did with Julie Bowers before Christmas.  I wanted to find out how the 5 Ps played a role in bringing the bowstring arch bridge that is like a family to her and the crew who restored it back to life. Here’s how the story happened. Enjoy! 🙂

 

1. Tell us briefly about yourself and your role in restoring historic bridges. I’ve been doing this for ten years. I knew nothing about bridges or restoration or bureaucratic politics when our bridge was lost to the N. Skunk River. I did have a background in construction, architecture and databases and used that as a base to build on. I don’t give up and have been called stubborn. We could not do this without a lot of sacrifice by everyone that travels to save a bridge but mostly we couldn’t do it without Bach Steel and Nels Raynor and our board of directors, both current and past.

 

 

  1. In your opinion, how special is the Paper Mill Bridge (PMB) in terms of its history and personal association with it?

It was erected in 1883, built by the King Iron Bridge Company. We think it is from around 1878 production design based on the lacing in the vertical outriggers and the castings. The bridge of many names (Skunk River Bridge, Humpback Bridge, McDowell for a minute then McIntyre, then Paper Mill) now the Marshall Family Bridge, is the heart of the Auburn Heights Preserve in Yorklyn, Delaware. A public / private partnership to clean up zinc laden habitat, to rebuild old warehouses including the Paper Mill and to build a trail system using historic bridges. If we had not had this project we would not have saved our bridge. It was a lot more work after falling in the river but it will live on.

bowers2

  1. Prior to its relocation from Iowa to Delaware, the PMB was once known as the McIntyre Bridge. Tell us about the bridge in its original location.

The bridge was located on River Road over the N. Skunk River in SE Poweshiek County. Our family had ties to the area and found ourselves there often for fall and winter picnics. When I returned to Iowa in 2001, we restarted those picnics. It fit it’s location perfectly and was safely in a park until flooding pushed it off it’s piers.

 

  1. In 2010, floodwaters swept the bridge off its foundations and caused severe damage. Tell us more about it and how it influenced your decision to restore the bridge.

My daughter and I found the bridge on the Sunday following Friday the 13th. We heard later the county crews were pulling trees up river that were compromising a concrete span. They came on down river and the roots entangled with the cable railing and pushed the span off the piers. It was our bridge, my family had been tied to that place for generations and I got the call. What are you going to do? We started educating ourselves, making calls, and figuring out our options. Turns out, all we needed was Bach Steel at that time, before the bridge went down.

 

  1. What was the plan for restoring the McIntyre Bridge in its original place and why did it fail?

It was just decisions that let us keep trying to figure out how much it cost and how to find the funds. There were setbacks, grant rejections, a lot of them, but we persevered. Our first plan was research, we were referred to Vern Mesler and Nathan Holth and had them  come to Iowa. We raised $3000 for that consult.  The bridge was still up at that point. When the bridge fell we were told about Nels Raynor and we proceeded with Nels to pull the bridge from the river and to work with us on this bridge and others. My daughter, Laran Bowers is on the board now, has been for years and that makes sense. She was the one that found the bridge. Jaydine Good rounds out the board and we have about 5 advisors that we utilize all the time for their perspectives. We wrote grants to the State Historic Preservation Office (SHPO), getting our County involved.

They subsequently reneged on their commitment to a TAP grant and we knew grants would never be our solution. When the county commissioners took back their backing, we knew that the solution was not going to be there and started looking. Flooding in August of 2009 changed everything from restoration plans to salvage, then restoration. No one ever decided not to save the bridge, it was always our number 1 priority through all of our efforts. We’ve educated a lot of folks on knowing the project before deciding to continue or not. We always knew our project costs from the beginning.

 

 Author’s Note: TAP stands for Transportation Alternative Program which focuses mainly on bridge rehabilitation/restoration instead of replacement.

 

6.  What happened to the McIntyre Bridge afterwards?

It went to Bach Steel for storage while we tried raising funds. Then we brought it back to Iowa because SHPO said we had moved the bridge out of Iowa. Then SHPO delisted the bridge because it was moved off it’s piers, they didn’t believe our scope and estimate, and the bridge was stored while we worked on other projects, became a contractor and tried earning funds rather than asking for funds.

 

Author’s Note: The bridge was listed on the National Register of Historic Places in the 1980s along with two dozen other bowstring arch bridges in Iowa. Because of its significance, grants were available to restore the bridge but only at its original location. The bridge can be delisted if it’s either altered beyond historic recognition, destroyed by natural disaster or demolition or moved to another location. Some exceptions do apply.

 

7. How and when did the opportunity to relocate and restore the McIntyre Bridge come about?

Nels Raynor and I worked with Project PATH at PennDOT with Kara Russell and Preservation Pennsylvania, providing scope and estimates on several bridges. Without that information it is very hard to sell a bridge in their program. That lead to a call from DNREC. McIntyre Bridge was certainly our choice although Nels would have preferred others that might not have had as much damage. It was a lot of work and the care that Derek and Lee and their crew put into the restoration was immense. There was twisting along the box chord but if you look close today, you will see very little distortion.

More on PATH: https://path.penndot.gov/

 

8. How was the bridge reconstructed?

Very carefully. It’s a bridge that will take pedestrians and we care. This is a bowstring truss. The eye-bars are connected with castings and pins to make the length  of the bridge and the verticals hit the eye-bars, connected with cast parts. The trusses were laid opposite to each other, so that they could be picked up nearly in place and then the lateral connections were put in. Miles of angle were welded together to make the vertical “star iron / cruciform posts that were beyond repair. This is what we call in-kind restoration which means if we have to recreate parts we do that.  The trusses required mending, heat straightening, pack rust removal and it took a long time to essentially rebuild our bridge. Nels did that for us because he said he would.

bowers3

 

9. Who were the actors involved in the restoration?

There were no actors involved. It took the expertise of Nels Raynor at Bach Steel along with his crew over years. It also took finding James Schiffer, P.E. Now he does some work for others but the original team of Workin Bridges was Nels, Jim and I. Derek and Lee Pung worked the most on the bridge, along with Nels son Brock and others that have learned iron working arts during this project.

10. What other factors led to the success in restoring the bridge?

Perseverance, not patience, and finding other work along the way, not just waiting around for grants and then deciding grants and donations aren’t enough. We started working the construction angle to have the funds to pay for overhead while some grants were pursued. Remember, you can’t do anything after the grant goes in. 6 months to wait for denial is no fun. As we went along we found more and more opportunities and we know what failure looks like. The board, under the direction of my father Dick Bowers, Gary Sanders, Diane Roth, Laran Bowers and now Jaydine Good have kept me pursuing the best outcome for our bridge and helping other people with their bridges.

 

11.  The bridge was renamed Paper Mill Bridge and later Marshall? Why was that? 

The Marshall Family owned the Paper Mill and the Mansion and a collection of vintage Stanley Steemers and other collectible vehicles. They donated this to the state parks system and DNREC wanted to honor the family by naming the bowstring after them. Marshall Family Bridge was dedicated last year while Mr. Marshall could be there.

 

12.  Paper Mill Bridge is now in Delaware, but there is talk of adding some bridges, a couple from Pennsylvania. Can you elaborate further on this?

Part of Project PATH was a pony truss bridge for sale that we added to the complement of bridges from York County, PA. The project criteria were to find bridges with different builders, types and ages from different states to complement the mills being restored. That bridge, now called Farm Lane, is a pony truss that we modified for strength and width with girders. We also widened it to allow for a pedestrian lane, and engineered it for vehicular traffic with a moveable railing if emergency or agricultural vehicles need to cross. Martin Road will become Snuff Mill. A pratt truss from Michigan has been restored and is being painted, awaiting installation at NVF.  Another large truss, the Portland Water Works bridge is in storage in Delaware for future installation after we purchased and transported it across country two years ago.

 

 13.     How would you theme the project, Saving the Paper Mill Bridge either as a title or in one sentence? The Skunk River Bridge Story – 1883 to present

 

14.   What future bridge restoration projects do you have on the agenda, especially the bowstring arch bridge, like the Paper Mill?

We are working on Watts Mill Road Bridge, a rare continuous pony truss, we have tried to take on Aetnaville Bridge in Wheeling as a restoration project knowing that $2.5 million could be useful for preservation. We saved the Springfield Des-Arc bridge in a new park, that was another bowstring. I think we are instrumental in Pennsylvania and Ohio utilizing Bach Steel to save bowstrings now. If they are the Kings of Kings, we know where that started. Any that we can find now will go into the “Bridge in a Box” sales program that we are developing. Of course we expanded on the Old Richardsville Bridge and are hopeful that the engineers will be required to work with us on the restoration needs. We found little to fix but the Kentucky Cabinet likes spending funds on local certified engineers, lots of money. We got the process started to showcase that it was much older and it will be preserved as a vehicular bridge. That took historical research from the bridge hunting community which was great to dial in the history that negated the NPS dates for NRHP.

 

 15. What words of advice would you give to those who are pursuing preserving and reusing a historic bridge, based on your personal experiences with this bridge?

It is always political. Find the economic benefits for the bridge to the local community. You can’t assume that they will take it on like Beaver County did with Watts Mill Road Bridge after it is reset. Engineers estimates are overly high so get another opinion. Engineers are asked specific questions by their clients that they answer – their answers don’t always look at preservation. For instance, the engineers estimate for Broadway Bridge in Frankfort assumes putting concrete back on it and doesn’t even consider planks or an engineered decking system. Some DOTS are really working hard at finding solutions, but we have to become competitive in selling a “Bridge in a Box – by Bach”  if we want to be competitive with those selling welded steel spans. Convincing and branding a membership driven “Workin'” non profit would create funds annually to help save bridges and other structures. We’ve looked into many ideas, some have merit, some do not. For now we do site visits that give real costs for restoration so that our clients can have enough information for good decisions to be made. We will be crafting more stories on video and perhaps a book on the McIntyre – we have footage of my father and other locals when we first started. We also have content on a lot of site visits that we will start to analyze and put out as well. Having a wonderful board that won’t let you give up even in the face of struggles is the secret. There will be struggles and set backs. Engineers want to build new bridges and cities don’t want the risks of old ones. We try to mitigate the risks.

It’s hard. We’ve learned a lot of valuable lessons as we pursued this. No good deed ever goes unpunished but there are a lot of great people and wonderful stories across the US. We saved our bridge but it took a lot out of all of us and it wasn’t the outcome we wanted but it was the best outcome for the bridge. Can’t wait to walk it again soon.

bowers1

Epilog: The Paper Mill/ Marshall Bridge has received a lot of national and international recognition after its reconstruction and re-erecting at its new home in Delaware, including the 2018 Ammann Awards for Best Example of a Restored Historic Bridge and Bridge of the Year, edging out the Blackfriar’s Bridge in Canada, whose design is similar to this bridge. While Blackfriar’s still retains the role of being the world’s longest of its kind, this bridge will definitely go down in the history books as one which was resurrected after a tragedy and is now being used again after years of hard work and lots of expertise. It sets the foundation for other historic bridge restorations that will come in the new decade, for they are becoming more important to save for future generations as the numbers dwindle due to progress and environmental disasters that are partly due to that progress. Progress is not welcomed unless we see some advantages in these. And as we learned this year with Greta Thunberg’s world tour, the environment will indeed be priority number one in our future plans for making things better. This is one of the projects that will benefit many.

BHC 10th anniversary logo1

Blackfriar’s Bridge in London: Powered with Solar Energy

The wub [CC BY-SA 4.0 (https://creativecommons.org/licenses/by-sa/4.0)%5D
Film clip

LONDON- The Blackfriars Railroad Bridge and its twin the Blackfriars Road Bridge, spanning the River Thames in London, are two of the oldest bridges still in operation. There’s not much mentioned on these two bridges aside from their history, yet there was one aspiring venture that was done on the railroad portion of the bridge which has not only revitalized the structure but has made it a popular attraction. Furthermore, this restoration and modernization of the bridge has set the precedent for finding creative ways to use renewable energy. The bridge is one of three in the world that is now powered by solar energy. In CNN’s Future Cities, the host of the show tells us why.

 

bhc-logo-newest1

Newsflyer: 16 September 2019

Quebec City Bridge. Photo by Martin St-Amant [CC BY-SA 3.0 (https://creativecommons.org/licenses/by-sa/3.0)%5D
bhc newsflyer new

 

To listen to the Podcast, please click here: https://anchor.fm/jason-smith-bhc19/episodes/BHC-Newsflyer-16-September–2019-e5fdn3

 

The Headines for this week (Details available per link):

Lawsuit against the State of Maine for its handling of a key historic bridge

Information on the Frank J. Wood Bridge: http://bridgehunter.com/me/cumberland/2016/

Information on the Lawsuit: https://www.paintsquare.com/news/?fuseaction=view&id=21566

Interview with the Chronicles:

https://bridgehunterschronicles.wordpress.com/2017/07/14/locals-fight-to-preserve-the-frank-j-wood-bridge-in-maine/

 

Historic Bridge in Erfurt, Germany relocated to its third home for rehabilitation. Fourth home being sought.

Article: https://bridgehunterschronicles.wordpress.com/2019/09/11/riethbrucke-in-erfurt-dismantled/

 

Fire destroys historic bridge over the Colorado River at Parker, Arizona.

Info on the Bridge: http://bridgehunter.com/ca/san-bernardino/540999/

Article: https://www.rtands.com/railroad-news/fire-destroys-genesee-wyoming-rail-bridge-across-colorado-river/

 

Historic Bill Thorpe Walking Bridge in Fredricton, New Brunswick getting new decking:

Article: https://www.cbc.ca/news/canada/new-brunswick/bill-thorpe-walking-bridge-construction-1.5284866

 

Canadian Government to reclaim the Quebec Bridge from Canadian National Railroad in an attempt to restore it

Information on Quebec Bridge: https://historicbridges.org/bridges/browser/?bridgebrowser=quebec/quebec/

Article: https://www.bridgeweb.com/Canadian-government-takes-action-to-restore-Quebec-Bridge/5065

 

Historic bridge in Sweden to be replaced.

Article: https://www.bridgeweb.com/Replacement-of-Swedens-Stor-Bridge-begins/5071

 

bhc-logo-newest1

Call to Action to Save the Route 66 Gasconade Bridge

312737-l
Photo courtesy of James Baughn

bhc newsflyer new

HAZELGREEN, MISSOURI- The days of the Gasconade River Bridge, which used to carry US Hwy. 66 near Hezelgreen may be numbered as it faces demolition scheduled for Spring of 2020 unless a new owner can be found.

The Missouri Department of Transportation (MODOT) has placed the 95-year old bridge under a 30-day public review and comment period which is halfway through its time and is scheduled to be completed by July 5th.  The historic bridge was built in 1924 by MODOT and consists of (from west to east) one 8-panel Warren pony truss with alternating verticals, two 8-panel Parker through trusses and one 6-panel Pratt through truss, all totaling a length of 526 feet. The structure is elgible for the National Register of Historic Places because of its design that was in connection with the standardized bridge movement that started in 1910. It is also in connection with Route 66 and its history, as the Highway, connecting Chicago with Los Angeles via Tulsa and Santa Fe was in operation from 1926 until the last segment of the highway was decommissioned in 1979. Interstate 40 had suplanted the stretch of highway where the bridge is located a years earlier.

Currently, the bridge is closed to traffic and a replacement bridge is being built alongside the historic structure, which will carry a frontage road running alongside the interstate once it’s completed next year. The Gasconade Bridge used to carry that road before its closure in 2015.

Attempts to find an owner for the new bridge and restore the structure to its original glory have not been successful due to differences in planning and realization combined with lack of funding for purchase and restoration. Yet the Gasconade Bridge Facebook (click here) has garnered support from over 1200 Followers and many more who are not on the social media scene. There have been rallies and fundraisers lately and a page where you can donate to save the bridge (click here).

Still the clock is ticking and with the resources and options running out, “only a public outcry expressing significant concern and a desire to save the bridge from demolition might help,” according to a statement on the Gasconade Facebook Page. If you would like to help in convincing government officials to save the bridge, here are the contact details you Need to know before you address your support for the bridge:

E-Mail: STIPcomments@modot.mo.gov

Phone: 1-888-275-6636

Mail: Transportation Planning, Program Comments, P.O. Box 270, Jefferson City, MO. 65102.

Identify the Gasconade River Bridge in Laclede County, MO. Give them your name and where you live and most importantly, why this bridge is important and is worth saving. It must be personal; all letters copied and pasted will not be acceptable.

To provide you with an incentive to convince MODOT, here’s an interview I did with Rich Dinkela about the bridge a few years ago. Click here to view.  A pair of YouTube videos of the bridge can be found below:

If you have any suggestions to help save the bridge or are interested in buying it, please contact the Group on their Facebook page. A link to their website you will find here.

 

bhc-logo-newest1

Update on the Hirschgrundbrücke Reconstruction

IMG_20190424_183721331_HDR

GLAUCHAU (SAXONY), GERMANY- Last week in the Chronicles’ Instagram page, there were a pair of photos of the progress that is being made with the Hirschgrund Viaduct, a multiple-span arch bridge spanning the ravine at the castle complex south of Glauchau’s city center. As I’ve been reporting up until now, the original bridge dating to the 1700s is being rebuilt after having sat abandoned for over four decades and having been in danger of collapsing under its own weight. With spring in the air, I took an opportunity to get a closer look at the bridge, apart from my usual vantage points, which were from both ends of the bridge. With all the scaffolding that has “encased” the bridge, this was the closest way to find out how it has progressed since my “sniper” shot of the red arches taken in the fall on the eve of a concert at St. George’s Church.

Then:

Now:

And with that I found a couple observations worth noting:

  1. The bridge was being layered with slabs of concrete, bit by bit, filling in the arches and making its way up.
  2. There was a pile of stones that are on the eastern side of the bridge- assumedly salvaged from the old structure and waiting to be reused and
  3. More curiously, vertical posts were sticking out between the arches.

With number 3, I wanted to find out what they were used for, so I got ahold of the city and one of the engineers for an inquiry. This is what I received for an explanation per e-mail (after having it translated):

The load-bearing system of the bridge consists of transverse walls on the piers and self-supporting longitudinal walls, which are then veneered. The inside of the bridge is filled with lightweight porous concrete.

In simpler languages, the newly-rebuilt bridge will have a skeletal system featuring horizontal slabs supported by the vertical piers planted between the arches. All of them will be covered in layers of concrete and then masked to make it appear historic like its original form. Should this be the case, it would not be the “in-kind” restoration of an arch bridge, meaning building it beginning with the arch and then in layers, stone-by-stone and then filled in to make sure the structure is stabilized. Yet it would represent the modern form of restoring the bridge, as it has been seen with some of the bridges restored in Germany, including those in Thuringia, Berlin and Bavaria. That would still make the arch bridge historic but with “braces” to ensure it lasts longer and is able to withstand the increasing weight and number in traffic. With the Hirschgrundbrücke itself, when reopened, it will serve pedestrians, connecting the castle complex and the park across the ravine.

IMG_20190424_184353461_HDR
The future of the original stones from the bridge is unknown.

While there is no concrete date as to when the project will be finished and when the grand “re-opening” will take place, there are some other curious facts that will be mentioned in a tour that is scheduled to take place this weekend. On May 11th at 10:15, 11:00 and 11:45 there will be a tour of the construction site with many questions and photo sessions available. This is all part of the informational Meeting at the Castle Complex that will include what has been completed and what will be the next phases in renovating the castle- namely the grounds and the park. All of which will start at 10 and be finished after 12:00. A link to the page can be found here.

In either case, more updates on the Hirschgrundbrücke will come in the Chronicles. Stay tuned. In case you haven’t taken a look at Glauchau’s Bridge tour guide, check out this and others by clicking here.

bhc-logo-newest1

Hayden Truss Bridge Opens to Traffic

 

55324-001
Hayden Bridge on the day of its reopening. Photo taken by Julie Bowers

Grand Reopening of the 1882 Whipple Through Truss Bridge after a thorough Rehabilitation.

SPRINGFIELD/ EUGENE, OREGON- Two years after acquiring the bridge and three decades after seeing its last train cross the McKenzie River, the Hayden Truss Bridge is officially open. As many as 40 people attended the grand reopening of the 1882 Whipple through truss bridge yesterday. The bridge was given a makeover by the restoration company, Workin’ Bridges, based in Holt, Michigan. The company, headed by Julie Bowers, purchased the structure in 2016 for the purpose of repurposing it as a pedestrian crossing. The two-year long project included repairs to the truss parts and bridge abutments, the replacement of the bridge decking and lastly, new railings to ensure people can use the bridge without any incident. BACH Steel and ASF Ironworks contributed to repairs and addition of metal to the bridges, including the railings. The cost for the project, according to the bridge’s facebook page, was approximately $100,000; much of which was covered through donations and other fundraising attempts. The last few weeks saw the completion of the rehabilitation being delayed due to snowfall which covered much of Oregon and the West Coast. The grand opening of the bridge saw the snow melt away and the sunshine of opportunity arise for the bridge. With the crossing open to traffic, plans are in the making to create a park using the bridge as its center piece. Wishful thinking is a replica of a historic covered bridge that existed right next to the truss bridge over a century ago. A video on the Covered Bridges of Lane County, which features an excerpt on the two bridge can be seen below:

For Bowers and Co., this is the third major accomplishment in the past three years, behind the Springfield Bowstring Arch Bridge in Arkansas and the Paper Mill Bridge (formerly McIntyre) in Delaware. Both bridges have garnered accolades in the form of the Ammann Awards and other awards on the state and national levels. And while the Hayden Bridge is in the running for the 2019 Bridgehunter Awards for Best Example of a Restored Historic Bridge, there are several other bridges that will need the service of the bridge restoration experts responsible for this bridge in Oregon. But for now, let’s celebrate this accomplishment, for the people of Springfield definitely deserve their bridge back. 🙂

 

fast fact logo

The Hayden Bridge was built by two Pennsylvania firms: Clark, Reeves and Co of Philadelphia and Phoenixville Bridge and Iron Works of Phoenixville. The 224-foot iron truss bridge features, pinned connections, ornamental decorations on its portal bracings and upper chord, as well as the octagonal Phoenix columns. The bridge used to serve the Weyerhauser Logging Railway but had originally been built in Corrine, Utah as part of a multiple-span crossing. It was relocated to its present spot in 1901 and served rail traffic until 1987. Details on the bridge can be found here. Springfield is located just east of Eugene in Lane County.

 

bhc-logo-newest1