BHC Pic of the Week Nr. 93

IMG_20200412_173611_062

PW

This Pic of the Week takes us back to Glauchau and a site where no one really expected this- a work of art that doesn’t need any type of bracing for support. This photo was taken during our walk on Easter Sunday and is that of the Hirschgrundbrücke at the Castle Complex. Since October 2018, the bridge had been rebuilt, piece by piece under a coat of steel scaffolding. Since the beginning of April, the cranes have disappeared and it was only the decking that needs to be finished on the bridge. Still, the scaffolding was covering the bridge for many days.

On this day, the bridge was presented in its former glory- stone bridge with its four arches; the photo taken just as the trees were about to blossom with flowers and leaves and the ground was about to become greener.  It looked like the bridge has arisen, as much as Jesus had arisen from the dead- both coming back to life to bring good tidings and love to the people. The difference, the bridge is here to stay while Jesus blessed it because of its beauty and its attachment to the castle and the nature that surrounds it. It was a real treat to see the bridge again after almost two years of absence.  And while the old structure could’ve been a great bridge of vegetation, like the one in Massachusetts, this structure will again connect history with nature- the castle and the park will again be one. And one that can be seen from the main street heading into the city center. ❤ 🙂

IMG_20200412_132825037

UPDATE:

The decking is almost finished and work will then include the south approach, which is a meter higher than the bridge itself. The plan is to make a ramp to allow for pedestrians and the handicapped to cross the structure. At the same time, a new park south of the bridge is being constructed to provide visitors with some nature and recreation. That area used to have garden houses before the property was completely razed in December, last year.  While CoVid 19 has delayed numerous construction projects globally, this project, weather permitting, is expected to be finished well before the deadline of the end of June. The reason:  Despite the lockdown in the state of Saxony, some construction projects were allowed to continue but using safety guidelines to ensure nobody was infected with the virus.

 

The Chronicles will keep you updated on the latest with this project, including the grand opening of the bridge and park complex. Stay tuned. 🙂

 

BHC 10 years

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.