BHC Pic of the Week Nr. 42

img_20190320_155510986_hdr

Looks can be deceiving in this pic of the week. At first glance one sees a bridge with a tower. From an oblique angle like this and directly in the sun, one can be fooled easily. However, we have two bridges. In the foreground is a 60+ year old bridge that is a concrete beam bridge. The H-shaped tower belongs to the new, replacement bridge in the background.  Since the Summer 2017, work has been progressing on the replacement bridge that will feature a cable-stayed span with one tower. When completed by the end of July of this year, it will be the third bridge of its kind, which has one tower, regardless of what bridge type (cantilever truss, suspension, cable-stayed), and eighth suspension-style bridge along the Zwickau Mulde, including a small section of the Mulde going from Sermuth to Grimma. The total length will be 220 meters, 40 meters longer than its current span, and it will be 5 meters higher.

The current structure, which was built in 1954 to replace a crossing destroyed in the Great Flood, will be torn down afterwards. This bridge is located between Schlunzig and Mosel and provides key access to the Volkswagen Company, which is three kilometers away. The road serves as a backroad between Glauchau and Zwickau.

Enjoy a great sunny weekend, wherever you are! 🙂

 

bhc-logo-newest1

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s